Long tiebacks, uncrewed subsea operations, CO₂ storage and the limits of full removal in decommissioning. These are the questions on the Technical Forum agenda at Energy Exchange Australia, the evolution of AOG. The 2027 event runs 2 to 4 March at the Perth Convention and Exhibition Centre, and registration is free.
Technical sessions to build your agenda around
The Technical Forum runs across all three days. Here are the first sessions confirmed.
Tuesday 2 March: subsea and offshore
Autonomous Offshore.
Remote and uncrewed systems, supported by AI, are changing how offshore assets are run. This panel covers what works today and what needs to come together over the next ten years. The panel also looks at where AI adds value in engineering workflows and where expert knowledge still has to lead.
Long Tiebacks and Marginal Subsea Developments.
Long tiebacks and marginal fields put pressure on flow assurance, power delivery and control over long distances. This panel looks at the technologies that make them viable, including subsea processing, compression and boosting, and local subsea power distribution. Hear what is working today, what is being proven, and how it could give existing facilities and new fields a longer, more productive life.
Subsea Intervention and Asset Life Extension.
Ageing offshore infrastructure can stay in service for longer. This session covers better assessment, in-situ repair, smarter materials and cheaper intervention, all aimed at avoiding shutdowns and full replacement.
Environmental Performance and Risk.
Environmental performance and regulation have changed. This panel covers how to manage environmental risk as a project and business priority from the earliest stages, including how environmental risk becomes project risk.
Wednesday 3 March: CCS and decommissioning
Australia’s Role in the Asia Pacific CO₂ Storage Market: From Regional Opportunity to Project Reality.
A presentation of findings from a UK Government-commissioned assessment of Asia Pacific CO₂ transport and storage. It covers named formations, infrastructure requirements and regional emitter-to-hub connections, and what the research means for WA’s CCS projects right now.
Australia’s CCS Projects: What’s Running, What’s Being Built and What’s Next.
Gorgon and Moomba are operating. Bonaparte and Bayu-Undan are in development. This session brings Australia’s CCS engineering teams together to look at what has been built, what the projects are delivering technically and what the next generation of CCS infrastructure looks like from an engineering perspective.
From Contamination Constraint to Controlled Capability: Early Lessons from Australia’s First Fully Automated Decontamination Unit.
Australia’s offshore decommissioning liability exceeds AUD 60 billion, with around 500 offshore wells and more than 5,000 km of pipeline facing removal decisions over the next two decades. As campaigns move from the seabed to shore, contamination is shaping recycling outcomes. This session covers what building Birdon’s enclosed, remote-operated decontamination unit has revealed about scaling the work for Australian conditions, from calibrating cleaning parameters to the testing regimes regulators and recyclers need. The unit now operates from Dampier, and the session shares preliminary operating data and the practical lessons of commissioning a first-of-kind system: what held, what didn’t and what still needs proving as throughput increases.
Remove Everything? Why Decommissioning End-States Need Evidence Long Before Execution.
Many operators treat full removal as the simplest decommissioning pathway. Buried pipelines, rock placement, stabilisation materials, legacy subsea assets and contamination can make end-state decisions far more complex, and any alternative pathway may need years of evidence development. This presentation covers where “remove everything” strategies break down, how to spot infrastructure that could create regulatory, technical or approval challenges, and what evidence to collect before critical options are lost. Attendees leave with a practical way to test whether their preferred outcome is achievable and defensible before it becomes a costly surprise.
Thursday 4 March: digital and automation
Scaling AI in Energy Operations.
What does it take to move AI beyond the pilot stage? This panel looks at where AI is delivering value in energy operations, what stands in the way of scaling it and how to manage the risks of connecting it to legacy assets.
Robotics, Digital Twins and The Future of Automation.
Robots and digital twins are changing how upstream teams work in hazardous and remote places. This panel looks at how the two work together to improve safety, keep ageing assets running and reduce downtime, and where automation goes next.
Industry voices on the program
The technical sessions run alongside keynotes from the operators and regulators shaping the sector.
Bill Townsend, Senior Vice President Corporate, INPEX
Bill will present on Wednesday 3 March. His keynote, Ichthys, Bonaparte and the Japan Australia Partnership, will cover what that partnership has delivered, how Bonaparte extends it and why dependable supply matters to both economies.
Shelley Robertson, Managing Director and CEO, Strike Energy.
Shelley will join the Major Projects Forum session Building WA’s Next Gas Projects on Wednesday 3 March. WA’s next gas producers are building now. Operators moving from exploration to production will share what they are delivering, when the work is coming and what they need from the supply chain, from Perth Basin gas and power to the Kimberley’s first onshore gas project.
Alastair Bisset, Head of Decommissioning, North Sea Transition Authority (NSTA)
Alastair will speak twice on Thursday 4 March. His Major Projects Forum keynote will cover how the NSTA uses data to drive better decommissioning outcomes. He will then join the regulatory briefing, where Australian and international regulators and operators will look at what changing requirements mean for companies planning and delivering decommissioning projects.
Michael Jeffrey, Work Package Manager, Allseas
Michael will join the Major Projects Forum panel on current and future decommissioning projects on Thursday morning. He will be speaking about Australia’s first large decommissioning campaign, involving one of the world’s largest vessels, the Pioneering Spirit, managed and operated by Allseas. Each speaker will get ten minutes, then the floor will open for questions.